Parapet support brackets & kickers.
The galvanized T-brackets and angle kickers that brace a wood-framed parapet back to its roof trusses. Fabricated, drilled and galvanized in our shop, so nothing has to be cut in the field twenty feet up.
- Hot-dip galvanized, ASTM A123
- 2–3 weeks, typical
- Free · Senoia, GA
- Own truck, Atlanta metro · LTL nationwide
What it is.
A short answer for the estimator, the framer, and the engineer who has to approve it.
A parapet brace is a diagonal steel kicker that ties a free-standing parapet wall back to the roof structure so wind cannot fold the wall over. On a wood-framed building the parapet is just the exterior studs running past the roof with nothing behind them. Where that wall stands more than a few feet above the deck, the engineer calls for a kicker at every truss, usually 24 inches on center, and a pair of steel brackets to connect it.
Our kit is that connection. Each TB-1 T-bracket is two pieces of 1/4-inch plate welded into a T: a 6 × 10 inch stem with a single 5/8-inch hole for the pin bolt, and a 6 × 4-1/2 inch base with four holes for 3/8-inch lag screws into solid blocking. The base spans a three-ply sandwich of stud, truss member and stud, so each lag lands in the outer plies. One bolt through the stem makes a pin, which is why the same bracket suits any kicker angle. The kicker is L3×3×1/4 angle, cut to your work-point length, drilled both ends, and hot-dip galvanized with the brackets.
We built this kit for a wood-framed daycare prototype in Acworth, Georgia, where fifty-nine of them were the only structural steel on the job. Every one of the 540 fasteners landed in lumber, not steel. That is the condition the kit is designed for.
Specifications.
Dimensions your engineer can check against the detail. We furnish this as a stamped-ready submittal drawing with every order.
| Bracket | Mark TB-1 · two pieces of 1/4" plate welded into a T |
|---|---|
| Stem plate | 6" wide × 10" tall · (1) Ø5/8" hole, 1" from top, centered · for 1/2" pin bolt |
| Base plate | 6" wide × 4-1/2" deep · (4) Ø1/2" holes · for 3/8" × 4-1/2" lag screws into solid blocking |
| Weld | 1/4" fillet both sides, continuous, E70XX · welded before galvanizing |
| Kicker | L3×3×1/4 angle · Ø5/8" hole each end · cut to your length, up to 10'-0" (≈ 5.1 lb/ft galvanized) |
| Material | ASTM A36 plate and angle |
| Finish | Hot-dip galvanized per ASTM A123, no shop prime · holes reamed clear of zinc |
| Hardware | Bracket pair: (8) 3/8" × 4-1/2" HDG hex lag screws + (8) HDG washers · Kicker: (2) 1/2" HDG bolt sets with washers |
| Weight | ≈ 6.2 lb per bracket · ≈ 55 lb per complete assembly at 8'-6" |
| Fits | Wood-framed parapets braced to pre-engineered wood trusses, brackets lagged to 2× blocking at panel points · spacing and count per your engineer of record |
| Made in | Senoia, Georgia · AISC-certified shop |
How it goes in.
The sequence we use on our own installs. Galvanizing removes the field-fix option, so the shop commits and the roof just receives.
Engineer approves
Send our submittal drawing to your engineer of record with the truss shop drawings. They confirm bracket location, count and work points; we cut to the approved lengths.
Framer blocks
Solid 2× blocking behind each upper bracket in the parapet, and blocking each side of the top chord at the truss panel point for the lower bracket. Nothing hangs until the blocking is in.
Brackets lag on
Layout with a line laser, then four 3/8" lags per bracket through the pre-drilled base. Upper base vertical against the parapet, lower base flat on the deck.
Kickers pin in
Each kicker drops between its two brackets and takes one 1/2" bolt at each end. The pinned connection self-aligns to the slope. Hang one, check it, then run the rest.
Questions we get asked.
From framers, estimators and engineers. If yours isn't here, it goes in the form below.
What is a parapet brace or kicker?
How far apart are parapet braces spaced?
Do I need an engineer to use these brackets?
Why hot-dip galvanized instead of painted?
What do I need to give you to cut the kickers?
What is the lead time, and do you ship or install?
Tell us about the parapet.
A count and a rough length is enough to start. We reply the same business day with pricing, lead time and, for Georgia jobs, an installed number.
Got it.
Your request is in the shop's inbox. We'll reply the same business day with pricing and lead time. If it's urgent, call (404) 680-5396.